BOMs
It refer to the materials, components,
and parts needed to manufacture or assemble a product.
- BOM LISTS (3.2.A): Lists of a bill of materials that we have created.
- BOM
ADD NEW (3.2.B)
-
BOM FIELD DECRIPTION (3.2.C)
Field | Description |
1. Date | Specify the date of BOM |
2. Name | Specify the name of BOM |
3. Branch | Specify the branch |
4. Project | Specify the project |
5. Attach Document | Specify the attach document of BOM |
6. Add Raw Material | Specify the raw material of BOM |
7. Add Finished Goods | Specify the finished goods of BOM |
8. Quantity | Specify the quantity |
9. Unit | Specify the unit (Auto-generated) |
10. Note | Specify the note of BOM |